CALCULATORS / POWER CONVERSION AND SWITCHING
MOSFET gate-drive sizing calculator
Gate charge average current and drive power; charge supplied at actual operating point.
SCENARIO COMPARISON
Compare the numbers.
This source describes an analytical model. Its quantities and checks are the view.
| Scenario | averageCurrentA | powerW | peakApproximationA |
|---|---|---|---|
| 0.003 | 0.03 | 0.3 | |
| 0.0024 | 0.024 | 0.24 |
All calculated quantities are listed with the inputs. Switch to Source to inspect the equations.
Change an input to see the consequences.
BASELINE INPUTS
CALCULATED
Edits change the baseline source.
Illustrative first-order example. Checks are editable requirements, not design standards. The broader topic may require additional equations, data, and validation.
Formula and units
This example uses the following equations. Input names and units match the editable source above.
- average current
averageCurrent = charge*frequency [A]- power
power = charge*driveVoltage*frequency [W]- peak approximation
peakApproximation = charge/switchTime [A]
Original worked example
These are the baseline values in the downloadable source. Edits above let you test your own values.
Given
- charge
- 30 nC
- drive voltage
- 10 V
- frequency
- 100000 Hz
- switch time
- 100 ns
Calculated
- average current
- 0.003 A
- power
- 0.03 W
- peak approximation
- 0.3 A
Assumptions and limits
Gate charge average current and drive power; charge supplied at actual operating point.
The requirement checks use the limits written in this example. Passing a check does not establish that the model covers every load, material behavior, or operating condition in a real design.
Download this .napkin example ↓Take it further with your agent
Napkin keeps the inputs, equations, checks and assumptions together in one study. Your agent sets it up; you change the numbers.
codex 'Use Napkin (https://napkin.engineering/mcp, or the local Napkin plugin) to build a study: MOSFET gate-drive sizing. Inputs: gate charge; frequency; desired switching time; voltage. Outputs: driver current; gate power; resistance screening. Model scope: First-order switching models and explicit nonidealities. Read napkin_capabilities and the current snapshot. Ask me for the values that matter, label assumptions with units, author .napkin source, validate it and apply it with napkin_source using the current revision, then open the study. Add checks for the limits I supply. Keep unsupported analyses explicit.'Claude needs the Napkin connector; Codex needs the Napkin plugin. Set up your agent ↗
The broader study
The topic brief below describes the broader scope. The worked example above states the particular calculation it implements.
- Inputs: gate charge, frequency, desired switching time, voltage
- Outputs: driver current, gate power, resistance screening
- Modes: calculate, compare, sweep
- Drawing: Switching waveforms and loss plots
EXECUTABLE WORKED EXAMPLE · FIRST-ORDER MODEL · CHECK THE SCOPE & ASSUMPTIONS
More in power conversion and switching
- Buck-converter first sizing
- Boost-converter first sizing
- Buck-boost converter screening
- Linear-regulator thermal budget calculator
- MOSFET conduction and switching losses calculator
- Rectifier voltage and heat estimate calculator
- H-bridge current and loss budget calculator
- RC snubber first estimate calculator
- Switching-inductor current ripple calculator
- DC-link capacitor sizing calculator
- Capacitive-load inrush estimate calculator